From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
26-Jul-24 10:00 | 31-Jul-26 16:00 | ATCO | Outage | 826s 504R (826s Marguerite Lake) | emergency removal to replace failed 502R @834S | Continuous |
735.25 Days
|
23-Aug-24 13:45 | 30-Jun-26 14:29 | ALTALINK | Outage | 157s C1 (157s Lac La Biche) | forced outage | 676.03 Days
Continuous |
|
10-Feb-25 00:00 | 23-Dec-25 23:00 | ATCO, ALTALINK | IO | 840s McNeill Station, 830L (562s Cypress - 840s McNeill Station), 840s 701T (840s McNeill Station), 840s 901T (840s McNeill Station) | available for emergency use only | 316.96 Days
Continuous |
AB-SK |
11-Mar-25 00:00 | 31-Dec-25 16:00 | ALTALINK | Outage | 377s 473C (377s AML Hardisty) | forced outage | 295.71 Days
Continuous |
|
18-Mar-25 14:00 | 17-Mar-26 17:30 | ALTALINK | Outage | 217s C1 (217s North Red Deer) | cap. bank unavailable and cannot be energized due to Koncar CTs being present | 364.15 Days
Daily |
|
20-Mar-25 08:00 | 20-Mar-26 17:00 | ALTALINK | Outage | 256s C1 (256s Harmattan) | forced outage | 365.38 Days
Continuous |
|
31-Mar-25 07:00 | 03-Oct-25 17:00 | EPCOR | Outage | 987s T1 (987s Clover Bar), 987s CCP7213 (987s Clover Bar), 987s CCP7214 (987s Clover Bar) | Cloverbar - TX1 LCR | 186.42 Days
Continuous |
|
31-Mar-25 07:00 | 19-Dec-25 17:00 | EPCOR | TE | Protection & Control (Woodcroft) | Woodcroft: protection blocking for merging unit and protection upgrade. | 263.46 Days
Continuous |
|
14-May-25 08:00 | 10-Feb-26 16:00 | ENMAX | TE | Protection & Control (SS-32) | 32sub 138kV autoswitching protection outage | 272.38 Days
Continuous |
|
08-Jun-25 15:00 | 25-Nov-25 15:30 | ALTALINK | Outage | 397s 864W (397s Benbow) | new 864L line construction, new 397s48 (VT6) install | 170.06 Days
Continuous |
|
13-Jun-25 17:00 | 11-Feb-26 17:00 | EPCOR | Outage | T3 (Rossdale) | Rossdale - TX3 LCR | 243.04 Days
Continuous |
|
07-Jul-25 08:00 | 19-Sep-25 16:00 | ENMAX | Outage | 21.1TR (SS-21) | 21.1TR replacement | 74.33 Days
Continuous |
|
12-Jul-25 08:00 | 18-Sep-25 16:00 | ENMAX | Outage | 14.1C (SS-14), 14.2C (SS-14) | capacitor bank switcher replacement | 68.33 Days
Continuous |
|
14-Jul-25 08:00 | 27-Sep-25 17:00 | ALTALINK | TE | 294s RTU/SCADA (294s Brazeau Outletworks) | RTU database updates | 75.38 Days
Daily |
|
16-Jul-25 07:00 | 19-Sep-25 17:00 | NWE | Outage | 2366 (NWE Marias) | install new equipment at Marias | 65.42 Days
Continuous |
AB-MATL |
21-Jul-25 09:00 | 19-Jan-26 17:00 | ATCO | TE | 732s Protection & Control (732s Mitsue) | the breaker fail protection will be disabled during the project, as we migrate from the existing to the new protection | 182.38 Days
Continuous |
|
21-Jul-25 09:00 | 23-Jan-26 16:30 | ATCO | TE | 732s RTU/SCADA (732s Mitsue) | existing RTU system being replaced with new SMP system | 186.35 Days
Continuous |
|
22-Jul-25 08:30 | 31-Dec-25 16:30 | ALTALINK | Outage | 263s C1 (263s Strachan) | forced outage | 162.38 Days
Continuous |
|
25-Jul-25 17:01 | 01-Nov-25 17:00 | EPCOR | Outage | T2 (EP Riverview) | bushing test failure (found during OE110184) | 99 Days
Continuous |
|
29-Jul-25 08:00 | 25-Sep-25 17:00 | ALTALINK, TRANSALTA | Outage | 33s 2 (33s Spray), 33s T2 (33s Spray) | maintenance | 58.38 Days
Continuous |
|
02-Aug-25 23:30 | 12-Sep-25 18:00 | ATCO | Outage | 827s SVC (827s Cranberry Lake) | forced outage | 40.77 Days
Continuous |
|
14-Aug-25 14:00 | 15-Sep-25 08:30 | ALTALINK | Outage | 33s 3 (33s Spray) | condition assessment | 31.77 Days
Continuous |
|
18-Aug-25 07:00 | 17-Oct-25 17:00 | EPCOR | Outage | T2 (Garneau), GT2 (Garneau) | garneau S/S Tx2 bay outage, repair w/vendor | 60.42 Days
Continuous |
|
18-Aug-25 07:00 | 21-Nov-25 17:00 | EPCOR | TE | 805s Protection & Control (805s Jasper) | protection blocking for P&C maintenance | 95.46 Days
Continuous |
|
18-Aug-25 08:00 | 11-Sep-25 17:00 | ALTALINK, TRANSALTA | Outage | 84L (33s Spray - 35s Rundle Plant), 85L (35s Rundle Plant - 54L tap), 64L (36s Three Sisters Plant - 35s Rundle Plant), 35s T1 (35s Rundle Plant), 35s T2 (35s Rundle Plant), 35s T3 (35s Rundle Plant), 36s T1 (36s Three Sisters Plant), 33s 84 (33s Spray), 35s 84 (35s Rundle Plant), 35s 85 (35s Rundle Plant), 35s 1 (35s Rundle Plant), 35s 52 (35s Rundle Plant), 35s 64 (35s Rundle Plant), 35s 2 (35s Rundle Plant), 35s 3 (35s Rundle Plant), 35s 4 (35s Rundle Plant), 35s 41 (35s Rundle Plant), 35s 8 (35s Rundle Plant), 35s 9 (35s Rundle Plant), 36s 64L42 (36s Three Sisters Plant), 36s 2600S1 (36s Three Sisters Plant), 36s 345S1 (36s Three Sisters Plant), 36s 1 (36s Three Sisters Plant) | maintenance | 24.38 Days
Continuous |
|
20-Aug-25 17:00 | 15-Oct-25 17:00 | ALTALINK | Outage | 931L (28s West Brooks - 132s Ware Junction), 28s 931N (28s West Brooks) | Restoration from real time storm | 56 Days
Continuous |
|
20-Aug-25 17:00 | 15-Oct-25 17:00 | ALTALINK | Outage | 1075L (28s West Brooks - 132s Ware Junction) | restoration from real time storm | 56 Days
Continuous |
|
25-Aug-25 08:00 | 26-Sep-25 16:00 | ENMAX | Outage | 32.1TR (SS-32) | slip over CT and new power cables installation and P&C works | 32.33 Days
Continuous |
|
25-Aug-25 09:00 | 20-Nov-25 17:00 | ATCO | TE | 710s Protection & Control (710s Vermilion) | protection and hardwired IO on-site will need to be cut-over to the new SCADA system and tested | 87.38 Days
Continuous |
|
26-Aug-25 08:00 | 27-Sep-25 17:00 | ALTALINK | Outage | 294s T1 (294s Brazeau Outlet Works), 294s 1 (294s Brazeau Outlet Works), 294s 2 (294s Brazeau Outlet Works), 294s 24 (294s Brazeau Outlet Works) | replace T1 and associated protections | 32.38 Days
Continuous |
|
28-Aug-25 08:00 | 16-Sep-25 20:00 | SUNCOR | Outage | 29PL9-24 (29EDD-94 Voyageur - 29EDD-60 Inglis Island), 29EDD-60 29PT-702 (29EDD-60 Inglis Island), 29EDD-60 30-252-400001 (29EDD-60 Inglis Island) | 29pt-702 - repair / replace burned bonding conductor (9000807989) | 19.5 Days
Continuous |
|
31-Aug-25 08:56 | 15-Sep-25 17:00 | ATCO | TE | 732s Protection & Control (732s Mitsue) | 902T protections will be blocked to prevent tripping 901, 906, 704 and 705, which will be in service | 15.34 Days
Continuous |
|
01-Sep-25 08:00 | 25-Sep-25 16:00 | ENMAX | Outage | 39.2TR (SS-39) | secondary cable replacement | 24.33 Days
Continuous |
|
01-Sep-25 14:01 | 15-Sep-25 14:00 | ATCO | Outage | 732s 902T (732s Mitsue), 732s 503R (732s Mitsue) | protection upgrade | 14 Days
Continuous |
|
01-Sep-25 16:00 | 12-Sep-25 20:00 | SUNCOR | Outage | 29EDD-71 29PT-235 (29EDD-71), 29EDD-71 752-4642 (29EDD-71), 29EDD-71 752-4641 (29EDD-71), 29EDD-71 29PS-263 (29EDD-71 Edd71Sub) | 29PT-235 tap changer repairs | 11.17 Days
Continuous |
|
02-Sep-25 07:00 | 14-Sep-25 17:00 | EPCOR | Outage | EP 803s T2 (EP 803s Lambton), EP 803s L2402 (EP 803s Lambton), EP 803s L2405 (EP 803s Lambton), EP 803s LAB2 (EP 803s Lambton) | lambton: lab2 lcr and tx2 zone doble and lds4/lds9 disconnect maintenance | 12.42 Days
Continuous |
|
02-Sep-25 07:00 | 12-Oct-25 17:00 | EPCOR | Outage | 557s T2 (557s Castle Downs) | transformer bay outage | 40.42 Days
Continuous |
|
02-Sep-25 07:00 | 26-Sep-25 17:00 | EPCOR | Outage | 805s T1 (805s Jasper) | jasper: tx1 bushing replacement (pcb) | 24.42 Days
Continuous |
|
02-Sep-25 07:00 | 26-Sep-25 17:00 | EPCOR | Outage | 72JW19 (EP 805s Jasper - Woodcroft), W721 (Woodcroft), EP 805s J724 (EP 805s Jasper), EP 805s JDS28 (EP 805s Jasper) | jw19: ofpt degass maintenance (ugt) | 24.42 Days
Continuous |
|
02-Sep-25 07:30 | 12-Sep-25 16:00 | ALTALINK | Outage | 1325L (510s Sunnybrook - AML 511s Crossings), AML 511s T11 (AML 511s Crossings), 510s T11 (510s Sunnybrook), AML 511s 4852 (AML 511s Crossings), AML 511s 4952 (AML 511s Crossings), 510s 2652 (510s Sunnybrook), 510s 2752 (510s Sunnybrook), AML 511s 1489 (AML 511s Crossings), AML 511s 74 (AML 511s Crossings), AML 511s 76 (AML 511s Crossings), 510s 41 (510s Sunnybrook), 510s 43 (510s Sunnybrook), 510s 4289 (510s Sunnybrook) | repair and maintenance | 10.35 Days
Continuous |
|
02-Sep-25 08:00 | 26-Sep-25 16:00 | ENMAX | Outage | 38.1C (SS-38) | capacitor bank switcher replacement | 24.33 Days
Continuous |
|
03-Sep-25 08:00 | 11-Sep-25 16:00 | ENMAX | Outage | 16.61L (SS-16 - SS-27), 16B69-16.61 (SS-16) | HV breaker maintenance | 8.33 Days
Continuous |
|
03-Sep-25 09:00 | 11-Sep-25 08:00 | ATCO | Outage | 951S 907 (951s Thickwood Hills) | installation of new POW relay/protection | 7.96 Days
Continuous |
|
04-Sep-25 07:00 | 22-Sep-25 19:30 | ALTALINK | RB | 784AL (482s Haynes - 784L tap), 784L (332s Ellis - 784AL tap), 784L (535s Joffre - 784AL tap) | stringing new CETO lines over top | 18.52 Days
Daily |
|
04-Sep-25 07:15 | 12-Sep-25 17:45 | ALTALINK | Outage | 712L (99s North St. Albert - 595s Spruce Grove), 99s 712X (99s North St. Albert), 595s 712 (595s Spruce Grove) | replace str, install new structures, and mod OHSW str 205 | 8.44 Days
Continuous |
|
05-Sep-25 08:00 | 07-Nov-25 16:00 | ENMAX | Outage | 1.83L (SS-1 - SS-8) | 1 sub Transmission line cut over. Line will terminate at new 1 sub upon return to service. | 63.38 Days
Continuous |
|
05-Sep-25 08:00 | 07-Nov-25 16:00 | ENMAX | Outage | 1.85L (SS-1 - SS-8) | 1 sub transmission line cut over. line will terminate at new 1 sub upon return to service. | 63.38 Days
Continuous |
|
05-Sep-25 13:00 | 12-Sep-25 14:00 | ALTALINK | Outage | 184s T1 (184s Petro-Canada Edmonton) | customer switchgear, bus duct, and NGR inspection | 7.04 Days
Continuous |
|
08-Sep-25 07:00 | 13-Sep-25 17:00 | EPCOR, ALTALINK | Outage | 657s T2 (657s Summerside), 657s SU2402 (657s Summerside), 657s SU2403 (657s Summerside), 657s SUAB2 (657s Summerside) | doble and disconnect maintenance | 5.42 Days
Continuous |
|
08-Sep-25 07:00 | 19-Sep-25 17:00 | EPCOR | RB | 711L (113s Inland Cement - 747L tap) | washing program | 11.42 Days
Continuous |
|
08-Sep-25 07:00 | 19-Sep-25 17:00 | ALTALINK | RB | 747L (37s North Calder - 711L tap), 747L (99s North St. Albert - 711L tap) | washing program | 11.42 Days
Continuous |
|
08-Sep-25 07:00 | 12-Sep-25 17:00 | ALTALINK, EPCOR | Outage | 947L (89s Ellerslie - 987s Clover Bar), 987s C2402 (987s Clover Bar), 987s C2404 (987s Clover Bar), 987s CDS28 (987s Cloverbar) | 947L zone doble and CDS27/CDS28/CDS29 disconnect maintenance | 4.42 Days
Continuous |
|
08-Sep-25 07:00 | 11-Sep-25 17:00 | ALTALINK | TE | 17s RTU/SCADA (17s Benalto) | RTU configuration update | 3.42 Days
Daily |
|
08-Sep-25 07:00 | 11-Sep-25 17:00 | ALTALINK | TE | 297s RTU/SCADA (297s Rimbey) | RTU configuration update | 3.42 Days
Daily |
|
08-Sep-25 07:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | 14PT138-Z31 secondary outage, relocate secondary wiring to new panel, 14.1TR transformer protection replacement | 10.38 Days
Daily |
|
08-Sep-25 07:00 | 17-Sep-25 16:00 | ENMAX | Outage | 14.1TR (SS-14) | transformer protection replacement | 9.38 Days
Continuous |
|
08-Sep-25 07:00 | 14-Sep-25 19:00 | ATCO | RB | 9L20 (755s Cordel - 766s Nevis) | complete construction activities on CETO project adjacent to 9L20 | 6.5 Days
Continuous |
|
08-Sep-25 07:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | 14sub 138kV 87 bus diff Z31protection outage, 14.1TR transformer protection replacement | 10.38 Days
Daily |
|
08-Sep-25 07:00 | 12-Sep-25 17:00 | ALTALINK | TE | 28s RTU/SCADA (28s West Brooks) | SCADA updates for emergency 931N switch replacement | 4.42 Days
Daily |
|
08-Sep-25 08:00 | 17-Sep-25 13:00 | ALTALINK | Outage | 204s T1 (204s Sandypoint) | relay setting changes and maintenance and temp gauge replacement | 9.21 Days
Continuous |
|
08-Sep-25 08:00 | 15-Sep-25 17:00 | ATCO | TE | 732s Protection & Control (732s Mitsue) | block 144 kV bus protection for Scada cutover | 7.38 Days
Continuous |
|
08-Sep-25 08:00 | 12-Sep-25 17:00 | ALTALINK | TE | 347s RTU/SCADA (347s Fox Creek) | update config for telecom rack move | 4.38 Days
Daily |
|
08-Sep-25 08:00 | 12-Sep-25 17:00 | ALTALINK | TE | 347s Protection & Control (347s Fox Creek) | protection outages on A87/138B & B87/138B for DC rack relocation | 4.38 Days
Daily |
|
08-Sep-25 08:00 | 11-Sep-25 16:00 | ENMAX | Outage | 8.3TR (SS-8) | transformer maintenance and power factor test, secondary cable and relay fault pressure test, reversing switch check | 3.33 Days
Continuous |
|
08-Sep-25 08:00 | 11-Sep-25 17:00 | ALTALINK | TE | 799s RTU/SCADA (799s Coleman) | deficiency clean up associated with new T3 and associated protection upgrade | 3.38 Days
Daily |
|
08-Sep-25 09:00 | 18-Sep-25 17:00 | BCH | IO | 5L92 (BCH Cranbrook - BCH Selkirk) | replace insulators and spacers | 10.33 Days
Continuous |
AB-BC |
08-Sep-25 09:00 | 18-Sep-25 17:00 | BCH | Outage | 5L92 (BCH Cranbrook - BCH Selkirk), T3 (BCH Cranbrook) | insulator replacement project step 5 | 10.33 Days
Continuous |
AB-BC |
08-Sep-25 09:30 | 12-Sep-25 17:00 | ALTALINK, EPCOR | IO | 947L (89s Ellerslie - 987s Clover Bar) | Cloverbar - 947L zone doble and CDS27/CDS28/CDS29 disconnect maintenance | 4.31 Days
Continuous |
|
08-Sep-25 10:00 | 19-Sep-25 17:30 | ATCO | Outage | 740s 703T (740s H.R.Milner), 740s 507C (740s H.R.Milner), 740s 703 (740s H.R. Milner), 740s 503 (740s H.R. Milner) | relay test switch mitigation and replacement, monitoring devices settings updates, relay testing | 11.31 Days
Continuous |
|
08-Sep-25 10:00 | 19-Sep-25 17:30 | ATCO | TE | 740s RTU/SCADA (740s H.R.Milner), 740s Protection & Control (740s H.R.Milner) | RTU upgrades | 11.31 Days
Continuous |
|
08-Sep-25 10:30 | 11-Sep-25 15:00 | ATCO | TE | 710s Protection & Control (710s Vermilion) | test existing 7L130 relays, 703T relays, and 703T ION to new SCADA system | 3.19 Days
Continuous |
|
08-Sep-25 13:30 | 11-Sep-25 16:30 | ALTALINK | IO | 931L (28s West Brooks - 132s Ware Junction), 28s 931N (28s West Brooks) | replace switch 28s931N | 3.13 Days
Continuous |
|
08-Sep-25 14:00 | 03-Oct-25 17:30 | ATCO | TE | 840s RTU/SCADA (840s McNeill Station) | pull cables or prep prior to the outage, valve cooling system improvements, server replacement, valve hall camera install, fire system inspections | 25.15 Days
Continuous |
|
09-Sep-25 07:00 | 22-Sep-25 19:30 | ALTALINK | RB | 775L (276s Prentiss - 535s Joffre) | stringing overtop 775L str 94-95 with the new CETO 962L/986L spans 56-57 | 13.52 Days
Daily |
|
09-Sep-25 07:00 | 22-Sep-25 19:30 | ALTALINK | RB | 793L (87s Gaetz - 535s Joffre) | stringing near 793L str 65-67 with the new CETO 962L/986L spans 56-57 | 13.52 Days
Daily |
|
09-Sep-25 08:00 | 12-Sep-25 17:00 | ATCO | TE | 879s Protection & Control (879s Scotford Upgrader) | isolating the main relays to test the associated aux relays that can send trips to shells 52-1A | 3.38 Days
Continuous |
|
09-Sep-25 08:00 | 18-Sep-25 14:00 | ATCO, ALBIAN | Outage | 9LJH2 (919s Hartley - 920s Jackpine), 920s 902T (920s Jackpine), 920s 902 (920s Jackpine), 920s B1 (920s Jackpine), 919s 907 (919s Hartley), 920s 9LJH-2D2 (920s Jackpine) | request from CNRL carry out the repairs on 72 kV cables connected to 902T |
9.25 Days
Continuous |
|
09-Sep-25 08:00 | 12-Sep-25 17:00 | ATCO | Outage | 879s 701T (879s Scottford Upgrader) | 52-1A taken out for work related to 1-00494256 | 3.38 Days
Continuous |
|
09-Sep-25 23:00 | 11-Sep-25 07:00 | ALTALINK, TRANSALTA | Outage | 250p T2 (250p Bighorn Plant) | maintenance | 1.33 Days
Continuous |
|
10-Sep-25 07:00 | 11-Sep-25 07:00 | ALTALINK, TRANSALTA | Outage | 250p T1 (250p Bighorn Plant) | maintenance | 24 Hours
Continuous |
|
10-Sep-25 08:00 | 11-Sep-25 17:00 | Lethbridge, ALTALINK | Outage | 146s 667 (146s Macdonald), 667L (146s MacDonald - 370s North Lethbridge) | cutover SCADA points from SURVALENT scout to SEL RTAC | 1.38 Days
Continuous |
|
10-Sep-25 08:00 | 11-Sep-25 17:00 | ALTALINK, Lethbridge | IO | 667L (146s MacDonald - 370s North Lethbridge) | cutover SCADA points from SURVALENT Scout to SEL RTAC | 1.38 Days
Continuous |
|
10-Sep-25 09:00 | 11-Sep-25 09:00 | ATCO | Outage | 881s 701T (881s Sturgeon) | maintenance | 24 Hours
Continuous |
|
11-Sep-25 07:00 | 11-Sep-25 17:00 | ALTALINK | RB | 860L (44s Bearspaw Plant - 291s Cochrane) | prep work in proximity to 860L str 50-58 | 10 Hours
Daily |
|
11-Sep-25 08:01 | 11-Sep-25 13:00 | ATCO | Outage | 951s 240kV 900BS1 (951s Thickwood Hills), 951s 1201T (951s Thickwood Hills), 951s 920C (951s Thickwood), 951S 901 (951s Thickwood Hills), 951S 904 (951s Thickwood Hills), 951S 907 (951s Thickwood Hills), 951s 910 (951s Thickwood Hills), 951s 901TA (951s Thickwood Hills) | 900bs1 outage for commissioning pow project | 4.98 Hours
Continuous |
|
11-Sep-25 08:45 | 11-Sep-25 09:00 | ATCO | Outage | 7L01 (813s Little Smoky - 881s Sturgeon 2) | this will require 7L01 to be de-energized for 10-15mins while 881s 701TD is closed | 15 Mins
Continuous |
|
11-Sep-25 09:00 | 11-Sep-25 13:00 | ATCO | Outage | 12L44 (939s Livock - 951s Thickwood Hills), 939s 1214R (939s Livock), 939s 1207 (939s Livock), 951s 1213R (951s Thickwood HIlls), 951s 1205 (951s Thickwood Hills), 951s 1206 (951s Thickwood Hills), 951s 1205B (951s Thickwood Hills), 951s 1206A (951s Thickwood Hills), 951s 12L44D1 (951s Thickwood Hills) | 500 kV bus inspection | 4 Hours
Continuous |
|
11-Sep-25 09:00 | 11-Sep-25 17:00 | ATCO | Outage | 700s 707C (700s Bonnyville) | replace incorrect RTXP switches | 8 Hours
Continuous |
|
11-Sep-25 13:00 | 12-Sep-25 14:00 | ATCO | IO | 951s 1201T (951s Thickwood Hills) | energizing 1201T and the system through 907 & 1205 breakers with new pow relays | 25 Hours
Continuous |
|
11-Sep-25 13:01 | 12-Sep-25 14:00 | ATCO | Outage | 951s 240kV 900BS1 (951s Thickwood Hills), 951s 1201T (951s Thickwood Hills), 951S 907 (951s Thickwood Hills), 951S 904 (951s Thickwood Hills), 951s 910 (951s Thickwood Hills), 951S 901 (951s Thickwood Hills), 951s 1205 (951s Thickwood Hills), 951s 1206 (951s Thickwood Hills), 951s 1201TA (951s Thickwood Hills), 951s 901TA (951s Thickwood Hills) | proof of concept commissioning. energizing 1201T and the system through 907 & 1205 breakers with new pow relays breakers will be opened/closed through out testing |
24.98 Hours
Continuous |
|
12-Sep-25 06:00 | 20-Sep-25 18:00 | ALTALINK | Outage | 860L (44s Bearspaw Plant - 291s Cochrane), 291s 860 (291s Cochrane), 44s 860W (44s Bearspaw Plant) | reroute str 51-58 | 8.5 Days
Continuous |
|
12-Sep-25 07:00 | 24-Sep-25 08:00 | ALTALINK | Outage | 185s T1 (185s Bretville) | NGR maintenance, T1 meter replacement.,T1 doble | 12.04 Days
Continuous |
|
12-Sep-25 08:00 | 07-Oct-25 16:00 | ENMAX | Outage | 33.1TR (SS-33) | tap changer refurbishments. soak test required | 25.33 Days
Continuous |
|
12-Sep-25 08:00 | 12-Sep-25 18:00 | ENMAX | Outage | 11.82L (SS-11 - SS-14), 14.1TR (SS-14), 14.3TR (SS-14), 14.1C (SS-14), 14.2C (SS-14), 14B138-11.82 (SS-14), 14MD138-14.1TR (SS-14), 14MD138-14.3TR (SS-14), 11B138-11.82 (SS-11) | substation - insulator washing, hot spot repair SW82, SW83. reversing switch check - 14.1-TC, 14.3-TC, remove overhead shield wire for corrosion testing | 10 Hours
Continuous |
|
12-Sep-25 08:00 | 12-Sep-25 12:00 | ATCO | Outage | 7L06 (784s Donnelly - 787s High Prairie), 787s 705 (787s High Prairie) | mobile substation install at 784s | 4 Hours
Continuous |
|
12-Sep-25 08:00 | 12-Sep-25 09:00 | ALTALINK | TE | AltaLink Telecom Equipment | NOC needs to change the quality of service (QOS) for configuration alignment remotely | 60 Mins
Daily |
|
12-Sep-25 09:00 | 17-Sep-25 17:00 | BCH | Outage | 2L113 (BCH Cranbrook - BCH Natal), 2D23 (BCH Cranbrook), 2D21 (BCH Natal) | NTL station rebuild | 5.33 Days
Continuous |
AB-BC |
12-Sep-25 09:00 | 12-Sep-25 17:00 | ALTALINK | Outage | 199s T2 (199s East Airdrie) | replace T2 LTC controller | 8 Hours
Daily |
|
12-Sep-25 13:00 | 26-Sep-25 17:00 | BCH | Outage | T4 (BCH Natal) | Natal substation replacement and ETM install | 14.17 Days
Continuous |
AB-BC |
13-Sep-25 07:00 | 15-Sep-25 10:00 | EPCOR | Outage | 987s GT1 (987s Clover Bar) | maintenance | 2.13 Days
Continuous |
|
13-Sep-25 08:00 | 13-Sep-25 12:00 | ENMAX | Outage | 37.81L (SS-37 - SS-38), 38.2TR (SS-38), 38.3TR (SS-38), 38.1C (SS-38), 37B138-37.81 (SS-37), 38B138-37.81 (SS-38) | fall substation insulator washing | 4 Hours
Continuous |
|
13-Sep-25 08:00 | 13-Sep-25 16:00 | EPCOR | TE | RTU/SCADA (Rossdale) | RTU repair | 8 Hours
Continuous |
|
13-Sep-25 08:00 | 13-Sep-25 13:00 | ALTALINK | Outage | 38s T1 (38s East Edmonton) | Extend 38sT1 CT wiring to DDR. Must be done to meet PRC002 compliance | 5 Hours
Daily |
|
13-Sep-25 08:00 | 23-Sep-25 16:00 | Syncrude | Outage | G20 (Aurora), T3 (Aurora), 89-15 (Aurora) | replace bushing and test transformer T3 in G02 substation | 10.33 Days
Continuous |
|
13-Sep-25 12:00 | 13-Sep-25 18:00 | ENMAX | Outage | 38.83L (SS-38 - SS-39), 38.1TR (SS-38), 38.3TR (SS-38), 38.1C (SS-38), 39B138-38.83 (SS-39), 38B138-38.83 (SS-38) | fall substation insulator washing | 6 Hours
Continuous |
|
13-Sep-25 13:30 | 13-Sep-25 18:00 | ALTALINK | Outage | 38s T4 (38s East Edmonton) | Extend 38sT1 CT wiring to DDR. Must be done to meet PRC002 compliance | 4.5 Hours
Daily |
|
14-Sep-25 08:00 | 14-Sep-25 12:00 | ENMAX | Outage | 24.81L (SS-24 - SS-31), 31.84L (SS-31 - SS-32), 31.3TR (SS-31), 31.2TR (SS-31), 24B138-24.81 (SS-24), 32B138-31.84 (SS-32), 31B138-31.84 (SS-31), 31B138-24.81 (SS-31) | Fall substation insulator washing | 4 Hours
Continuous |
|
14-Sep-25 08:30 | 14-Sep-25 18:30 | ALTALINK | Outage | 89s T2 (89s Ellerslie) | PRC005 testing of GDRs, gas detector replacement on 1 phase, testing of sudden pressure relief devices. | 10 Hours
Daily |
|
14-Sep-25 12:00 | 14-Sep-25 18:00 | ENMAX | Outage | 9.80L (SS-9 - SS-31), 31.1TR (SS-31), 31.2TR (SS-31), 31.1C (SS-31), 31B138-9.80 (SS-31), 9B138-9.80 (SS-9) | fall substation insulator washing | 6 Hours
Continuous |
|
15-Sep-25 07:00 | 19-Sep-25 17:00 | EPCOR | Outage | EP 511s Victoria T1 (EP 511s Victoria), EP 511s V721 (EP 511s Victoria), EP 511s V722 (EP 511s Victoria) | Victoria - TX1 zone (V721 PT) LCR | 4.42 Days
Continuous |
|
15-Sep-25 07:00 | 16-Sep-25 17:00 | ALTALINK | RB | 1201L (520s Bennett - BCH Cranbrook) | prepping the component replacement project from 1201L21 – 1201L435 | 1.42 Days
Daily |
|
15-Sep-25 07:00 | 18-Sep-25 17:00 | ALTALINK | TE | 17s RTU/SCADA (17s Benalto) | RTU configuration update | 3.42 Days
Daily |
|
15-Sep-25 07:00 | 18-Sep-25 17:00 | ALTALINK | TE | 297s RTU/SCADA (297s Rimbey) | RTU configuration update | 3.42 Days
Daily |
|
15-Sep-25 07:00 | 15-Sep-25 17:00 | ENMAX | RB | 40.81L (SS-40 - SS-41) | fall transmission line washing | 10 Hours
Continuous |
|
15-Sep-25 07:00 | 15-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | tranformer protection replacement | 9 Hours
Daily |
|
15-Sep-25 07:00 | 16-Sep-25 17:00 | EPCOR | Outage | 52s T2 (52s East Industrial), 52s E2402 (52s East Industrial) | MV protection upgrade cutovers | 1.42 Days
Continuous |
|
15-Sep-25 07:00 | 20-Sep-25 17:00 | EPCOR | Outage | 987s CCP7214 (987s Clover Bar), 987s T1 (987s Clover Bar), 987s CCP7213 (987s Clover Bar), 987s C2401 (987s Clover Bar), 987s C2403 (987s Clover Bar), 987s C2402 (987s Clover Bar), 987s T3 (987s Clover Bar) | cloverbar: TX1 and TX3 zone, Insulator stand install and CT removal | 5.42 Days
Continuous |
|
15-Sep-25 07:00 | 21-Sep-25 19:00 | ATCO | RB | 9L20 (755s Cordel - 766s Nevis) | hold off on 9l20 to complete construction activities on CETO project adjacent to 9L20 | 6.5 Days
Continuous |
|
15-Sep-25 07:00 | 15-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | 14.1TR transformer protection replacement | 9 Hours
Daily |
|
15-Sep-25 07:00 | 15-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | 14.1TR tranformer protection replacement | 9 Hours
Daily |
|
15-Sep-25 07:00 | 15-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | auto switch protection scheme outage for capacitor bank switcher replacement commissioning | 9 Hours
Daily |
|
15-Sep-25 07:30 | 18-Sep-25 18:30 | ATCO, ALTALINK | RB | 530L (104s Watson Creek - 2085s Sheridan) | climbing inspection | 3.46 Days
Continuous |
|
15-Sep-25 07:45 | 15-Sep-25 15:00 | CMH | Outage | MHS-8 MH138-T81 (MHS-8 Burnside) | Installing missing bracing for transformer MH138-T81 radiator at Burnside Substation. | 7.25 Hours
Continuous |
|
15-Sep-25 08:00 | 19-Sep-25 16:00 | ALTALINK | TE | 297s Protection & Control (297s Rimbey) | cutover and commission transfer trip to L9 feeder protection relay | 4.33 Days
Daily |
|
15-Sep-25 08:00 | 19-Sep-25 17:00 | ALTALINK | TE | 297s Protection & Control (297s Rimbey) | recommission circuits | 4.38 Days
Daily |
|
15-Sep-25 08:00 | 15-Sep-25 18:00 | ALTALINK | Outage | 421s T1 (421s Hays) | creating open point 'A' on 25kV bus 1 to accommodate 421s14 urgent switch replacement | 10 Hours
Daily |
|
15-Sep-25 08:00 | 26-Sep-25 17:00 | ALTALINK | TE | 294s Protection & Control (294s Brazeau Outletworks) | trip testing from new T2 protection | 11.38 Days
Daily |
|
15-Sep-25 08:00 | 20-Sep-25 16:00 | SUNCOR | TE | 29PL6-22 (29EDD-1 Millennium - 29EDD-2 Tar Island) | 29PL6-22 A87L GE L90 firmware upgrade - 300477551 | 5.33 Days
Continuous |
|
15-Sep-25 08:00 | 18-Sep-25 18:00 | ATCO, ALTALINK | RB | 6L530 (104s Watson Creek - 2085s Sheridan) | climbing Inspection | 3.42 Days
Continuous |
|
15-Sep-25 08:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-8) | 8 sub 138kV secondary PT-E1 X and Y core. 8 sub panel upgrades for 1 sub transmission cut over | 3.33 Days
Daily |
|
15-Sep-25 08:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-8) | panel upgrades for 1 sub transmission cut over | 3.33 Days
Daily |
|
15-Sep-25 08:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-8) | 8 sub 138kV secondary PT-E5 X and Y core | 3.33 Days
Daily |
|
15-Sep-25 08:30 | 20-Sep-25 14:00 | ALTALINK | Outage | 184s T2 (184s Petro-Canada Edmonton) | T2 doble, maintenance, leaks and customer switchgear, bus duct, and NGR inspection | 5.23 Days
Continuous |
|
15-Sep-25 09:00 | 19-Sep-25 17:00 | ATCO | Outage | 729s 703T (729s Otauwau), 729s 703 (729s Otauwau) | 703T major and 503VR major/tap changer | 4.33 Days
Continuous |
|
15-Sep-25 09:00 | 26-Sep-25 12:00 | ATCO | Outage | 7L06 (784s Donnelly - ATC 793s West Peace River), 784s 701T (784s Donnelly), ATC 793s 703 (ATC 793s West Peace River), 784s 701 (784s Donnelly), 784s 7L06D2 (784s Donnelly) | replace failed 7L06D2 mod | 11.13 Days
Continuous |
|
15-Sep-25 09:00 | 18-Sep-25 18:00 | ALTALINK | Outage | 799L (235s Entwistle - 443s South Mayerthorpe), 235s 799N (235s Entwistle) | 799L rebuild (str 830-858) | 3.38 Days
Continuous |
|
15-Sep-25 09:00 | 15-Sep-25 17:00 | ALTALINK | Outage | 708L (233s Beamer - 708AL tap), 233s 708X (233s Beamer) | update grounding connections | 8 Hours
Daily |
|
15-Sep-25 09:00 | 15-Sep-25 17:00 | ATCO | TE | ATCO Telecom Equipment, 860s RTU/SCADA (860s Crow) | crow telecom SIPA phase out project - replace old SIM card with IoT SIM and re-configure microhard modem with NSG |
8 Hours
Continuous |
|
15-Sep-25 09:00 | 18-Sep-25 16:00 | ATCO | RB | 7L20 (810s Dome Cutbank - 7L228 tap), 7L20 (740s H.R. Milner - 810s Dome Cutbank) | installing overhead guy wire to support H Frame structure 52 | 3.29 Days
Continuous |
|
15-Sep-25 09:00 | 15-Sep-25 12:00 | ENMAX | TE | 7.84L (SS-7 - SS-36) | transfer from JMUX to JPAX circuits | 3 Hours
Continuous |
|
15-Sep-25 09:30 | 21-Sep-25 17:00 | EPCOR, ALTALINK | Outage | 665s D2403 (665s Dome), 909L (310p Sundance - 665s Dome), 665s D2402 (665s Dome), 665s T2 (665s Dome) | dome: 909LW/TX2 doble and DDS4/DDS5/DAB2 disconnect maintenance and relay maintenance | 6.31 Days
Continuous |
|
15-Sep-25 09:30 | 21-Sep-25 17:00 | ALTALINK, EPCOR | Outage | 909L (310p Sundance - 665s Dome) | dome: 909LE/TX2 doble and DDS4/DDS5/DAB2 disconnect maintenance and relay maintenance | 6.31 Days
Continuous |
|
15-Sep-25 09:30 | 18-Sep-25 12:30 | ALTALINK | Outage | 33s 1 (33s Spray) | replacement | 3.13 Days
Continuous |
|
15-Sep-25 10:00 | 03-Oct-25 17:30 | ATCO | Outage | 840s McNeill Station | converter inspection @ mcneill 840s breaker sf6 hpl complete testing | 18.31 Days
Continuous |
AB-SK |
15-Sep-25 10:00 | 15-Sep-25 17:00 | ATCO, NextEra, PWLP | TE | 114s RTU/SCADA (114s Ghost Pine), 973s RTU/SCADA (973s Lanes Lake), ATCO Telecom Equipment | MDR 8000 radio link PM between Elnora_T and Ghospine_S | 7 Hours
Continuous |
|
15-Sep-25 10:30 | 26-Sep-25 12:00 | ALTALINK, TRANSALTA | Outage | 33s T1 (33s Spray) | testing | 11.06 Days
Daily |
|
15-Sep-25 12:00 | 18-Sep-25 16:00 | ATCO | Outage | 860s 701T (860s Crow), 860s 301 (860s Crow) | transformer class2 tap changer and major testing | 3.17 Days
Continuous |
|
15-Sep-25 13:00 | 18-Sep-25 15:00 | ATCO | RB | 7L79 (771s Veteran - 932s Pemukan), 7L79 (771s Veteran - 892s Ribstone Creek) | install frost mitigation inter-phase spacers (live line) | 3.08 Days
Continuous |
|
15-Sep-25 13:00 | 15-Sep-25 14:00 | BCH | Outage | 2L112 (BPA Boundary - BCH Nelway) | EMERGENCY REPLACEMENT OF A BOUNDARY PCB AND IN ORDER TO MOVE IT INTO LOCATION WE NEED TO CLEAR PCB A-1220 WHICH WILL OPEN END THE BOUNDARY-NELWAY NO 1 230KV LINE. | 60 Mins
Continuous |
AB-BC |
15-Sep-25 13:00 | 15-Sep-25 14:00 | BCH | Outage | 2L112 (BPA Boundary - BCH Nelway) | PROXIMITY WORK REMOVING OLD BREAKER ON TRAILER UNDER MAIN BUS SIDE OF PCB A-1220 | 60 Mins
Continuous |
AB-BC |
15-Sep-25 13:00 | 15-Sep-25 16:00 | ENMAX, ALTALINK | TE | 7.82L (42s Sarcee - SS-7) | transfer from JMUX to JPAX circuits | 3 Hours
Continuous |
|
15-Sep-25 13:00 | 15-Sep-25 16:00 | ENMAX, ALTALINK | TE | 7.82L (42s Sarcee - SS-7) | 7.82L A and B line protection outage -transfer from JMUX to JPAX circuits | 3 Hours
Daily |
|
15-Sep-25 13:30 | 19-Sep-25 17:30 | ALTALINK | Outage | 514L (513s Lundbreck - 514BL tap), 513s T1 (513s Lundbreck), 513s 1 (513s Lundbreck) | 513s T1 PCB bushing replacement | 4.17 Days
Continuous |
|
15-Sep-25 14:01 | 29-Sep-25 14:00 | ATCO | Outage | 7L30 (732s Mitsue - 844s AEC Mill), 732s 704 (732s Mitsue), 732s 707 (732s Mitsue), 844s 703 (844s AEC Mill), 732s 7L30D1 (732s Mitsue) | protection upgrade - remove old protection, cut over to new protection and cut over equipment status, control and alarms to new station controller | 14 Days
Continuous |
|
15-Sep-25 15:00 | 18-Sep-25 15:00 | ATCO | Outage | 7L53 (700s Bonnyville - 7LA53 tap), 700s 702 (700s Bonnyville) | line to ground clearance mitigation for span 619-620, line to line clearance mitigation for span 702-703 | 3 Days
Continuous |
|
15-Sep-25 18:00 | 18-Sep-25 17:00 | ALTALINK | Outage | 421s T2 (421s Hays) | Urgent replacement of 421s14 due to bird contact and switch contact cleaning of 421s18 due to maintenance identified hotspot. | 2.96 Days
Continuous |
|
16-Sep-25 07:00 | 17-Sep-25 18:00 | ALTALINK, TRANSALTA | Outage | 514L (396s Pincher Creek - 514BL tap), 514L (513s Lundbreck - 514BL tap), 322s T1 (322s Cowley Ridge), 396s 514N (396s Pincher Creek) | replacing structures 16 and 76 Replacing arms and insulators on structure 170 | 1.46 Days
Continuous |
|
16-Sep-25 07:00 | 16-Sep-25 12:00 | ENMAX | Outage | 14.3TR (SS-14) | trip testing and transformer protection replacement | 5 Hours
Continuous |
|
16-Sep-25 07:00 | 18-Sep-25 17:00 | ALTALINK | TE | 17s Protection & Control (17s Benalto) | B & A protections implement and test temporary settings as part of September 17 17s757N outage | 2.42 Days
Daily |
|
16-Sep-25 07:00 | 18-Sep-25 17:00 | ALTALINK | TE | 580s Protection & Control (580s Sylvan Lake) | 637L B & A protections implement and test temporary settings on 637L line protection relays as part of september 17 17s757N outage to meet 17s SLD note 7 requirements | 2.42 Days
Daily |
|
16-Sep-25 07:00 | 16-Sep-25 17:00 | ENMAX | RB | 31.84L (SS-31 - SS-32) | fall transmission line washing | 10 Hours
Continuous |
|
16-Sep-25 07:00 | 16-Sep-25 09:00 | ENMAX | Outage | 1.80L (SS-1 - SS-28) | fall transmission line washing | 2 Hours
Continuous |
|
16-Sep-25 07:00 | 16-Sep-25 17:00 | ALTALINK | Outage | 735L (171s Redwater - 233s Beamer), 171s 735X (171s Redwater), 233s 735N (233s Beamer) | update 735L LA grounding connections | 10 Hours
Daily |
|
16-Sep-25 08:00 | 18-Sep-25 17:30 | ALTALINK, Keyera Cynthia | Outage | 359s T2 (359s Esso West Pembina), 359s 202AX (359s Esso West Pembina), 359s 14 (359s Esso West Pembina) | bushing replacement, doble, maintenance, leaks, LTC maintenance | 2.4 Days
Continuous |
|
16-Sep-25 08:00 | 16-Sep-25 12:00 | ENMAX | Outage | 16.60L (SS-16 - SS-34), 34.2TR (SS-34), 34B69-16.60 (SS-34), 34MD69-34.2TR (SS-34) | fall insulator washing, reversing switch check - 34.2-TC | 4 Hours
Continuous |
|
16-Sep-25 08:00 | 18-Sep-25 17:00 | ALTALINK | TE | 368s Protection & Control (368s Burdett) | PRC relay maintenance s879 96/752 oos less than 6 hours | 2.38 Days
Daily |
|
16-Sep-25 08:00 | 16-Sep-25 17:00 | ALTALINK | TE | 12s RTU/SCADA (12s Heartland), AltaLink Telecom Equipment | upgrade MPLS node | 9 Hours
Daily |
|
16-Sep-25 08:00 | 16-Sep-25 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 324s RTU/SCADA (324s Cassils) | complete MPLS upgrade | 9 Hours
Daily |
|
16-Sep-25 08:00 | 16-Sep-25 17:00 | ALTALINK, TRANSALTA | TE | 229s RTU/SCADA (229s Glenwood), 502s RTU/SCADA (502s Shell Waterton (#2)), AltaLink Telecom Equipment | MPLS upgrade at 9232R | 9 Hours
Daily |
|
16-Sep-25 08:00 | 16-Sep-25 17:00 | ALTALINK | TE | 454s Protection & Control (454s Buck Lake) | standard relay maintenance | 9 Hours
Daily |
|
16-Sep-25 08:00 | 16-Sep-25 17:00 | ALTALINK | TE | 281s Protection & Control (281s Johnson) | relay maintenance | 9 Hours
Daily |
|
16-Sep-25 08:00 | 17-Sep-25 16:00 | ATCO | RB | 7L228 (845s Big Mountain - 7L20 tap) | high load move | 1.33 Days
Continuous |
|
16-Sep-25 09:00 | 19-Sep-25 17:00 | BCH | Outage | 5L72 (BCH Mica G.S. - BCH Nicola) | F26 AOP NERC CN PM on NIC 5CB3, 5CB13 and 5B43. CPC to enter PN's OOS OAT
|
3.33 Days
Continuous |
|
16-Sep-25 09:00 | 16-Sep-25 11:00 | ENMAX | Outage | 1.81L (SS-1 - SS-20) | fall transmission line washing | 2 Hours
Continuous |
|
16-Sep-25 09:00 | 18-Sep-25 17:00 | ALTALINK | TE | 368s RTU/SCADA (368s Burdett) | techs will be cleaning up scada/cabling deficiencies from the lan es1 installation that was completed on June 11/12, 2025 | 2.33 Days
Daily |
|
16-Sep-25 09:00 | 16-Sep-25 17:30 | ALTALINK | Outage | 68s T2 (68s Willesden Green) | first trip & PRC breaker maintenance | 8.5 Hours
Daily |
|
16-Sep-25 09:00 | 16-Sep-25 16:00 | ATCO | TE | ATCO Telecom Equipment, 733s RTU/SCADA (733s Simonette) | network firewall replace for low bes project | 7 Hours
Continuous |
|
16-Sep-25 09:00 | 16-Sep-25 17:00 | ALTALINK | TE | 310p RTU/SCADA (310p Sundance) | update configuration for remote access | 8 Hours
Daily |
|
16-Sep-25 09:00 | 16-Sep-25 12:00 | ENMAX | TE | 2.84L (SS-2 - SS-8) | transfer from JMUX to JPAX circuits | 3 Hours
Continuous |
|
16-Sep-25 10:00 | 16-Sep-25 17:00 | ATCO | TE | ATCO Telecom Equipment, 802s RTU/SCADA (802s Michichi Creek) | Radio Link PM Between Drumheller and Michichi | 7 Hours
Continuous |
|
16-Sep-25 10:30 | 18-Sep-25 17:30 | ALTALINK | Outage | 478s T2 (478s Tucuman) | transformer/LTC maint and sudden pressure relay repair | 2.29 Days
Continuous |
|
16-Sep-25 10:30 | 18-Sep-25 15:00 | ATCO | TE | 710s Protection & Control (710s Vermilion) | test existing 707C A & B relays as well as 707C Ion to new SCADA system | 2.19 Days
Continuous |
|
16-Sep-25 11:00 | 16-Sep-25 13:00 | ENMAX | Outage | 9.83L (SS-9 - SS-43) | Fall transmission line washing | 2 Hours
Continuous |
|
16-Sep-25 11:00 | 18-Sep-25 17:00 | ALTALINK | Outage | 368s C1 (368s Burdett) | cap bank protection PRC maintenance | 2.25 Days
Continuous |
|
16-Sep-25 12:00 | 16-Sep-25 18:00 | ENMAX | Outage | 21.61L (SS-21 - SS-34), 34.1TR (SS-34), 34B69-21.61 (SS-34), 34MD69-34.1TR (SS-34) | fall insulator washing, reversing switch check - 34.1-TC | 6 Hours
Continuous |
|
16-Sep-25 12:00 | 16-Sep-25 16:00 | ENMAX | Outage | 14.4TR (SS-14) | trip testing and tranformer protection replacement | 4 Hours
Continuous |
|
16-Sep-25 13:00 | 16-Sep-25 17:00 | ENMAX | Outage | 33.84L (SS-33 - SS-43) | Fall transmission line washing | 4 Hours
Continuous |
|
16-Sep-25 13:00 | 16-Sep-25 16:00 | ENMAX | TE | 2.82L (SS-2 - SS-5) | 2.82L A and B Line Protection Outage. Transfer from JMUX to JPAX circuits. Fault clearing time 26.5 cycles. | 3 Hours
Continuous |
|
17-Sep-25 06:00 | 17-Sep-25 17:00 | ATCO | IO | ATCO RTU/SCADA | SOC2 backup control centre activation system operation will perform the failover to SOC2 Edmonton |
11 Hours
Continuous |
|
17-Sep-25 07:00 | 17-Sep-25 17:00 | ENMAX | RB | 11.82L (SS-11 - SS-14) | fall transmission line washing | 10 Hours
Continuous |
|
17-Sep-25 07:30 | 18-Sep-25 18:30 | ALTALINK, TAYLORPP | Outage | 256s 228X (256s Harmattan), 148s AG-EB25A (148s Schantz), 148s AG-EB510B (148s Schantz), 148s AG-EB510C (148s Schantz), 148s AG-EB510D (148s Schantz), 148s T1 (148s Schantz), 148s T2 (148s Schantz), 148s T3 (148s Schantz) | LAN switch replacement | 1.46 Days
Continuous |
|
17-Sep-25 08:00 | 24-Sep-25 18:00 | SUNCOR | Outage | 29PL7-4 (29EDD-65 - 29EDD-71), 29EDD-65 29PS-0284 (29EDD-65 Edd65Sub), 29EDD-71 29PS-243 (29EDD-71 Edd71Sub), 29EDD-65 29PT-0257 (29EDD-65) | FB-Maintenance, Repairs and Testing - PRC-5 Testing, 29PT-260, 29PL7-4, 29PT-241, 29PT-257, 29PS-243 (300415541, 31807283, 31773784, 300109525) | 7.42 Days
Continuous |
|
17-Sep-25 08:00 | 17-Sep-25 16:00 | ALTALINK | TE | 297s Protection & Control (297s Rimbey) | replacement of the 17s breaker maintenance switch and installation of new protections at 297s | 8 Hours
Daily |
|
17-Sep-25 08:00 | 17-Sep-25 16:00 | ALTALINK | TE | 17s Protection & Control (17s Benalto) | 17s A77/1144AIS modify relay settings and commission new transfer trip to new customer | 8 Hours
Daily |
|
17-Sep-25 08:00 | 17-Sep-25 16:00 | ENMAX | Outage | 9.3TR (SS-9), 2.81L (SS-2 - SS-9), 9.83L (SS-9 - SS-43), 9.2TR (SS-9) | Substation - Insulator Washing (Fall), Shield wire corrosion testing 2.81L. Investigate 9.3TR gas alarm circuit. No grounding required for shield wire testing. | 8 Hours
Continuous |
|
17-Sep-25 08:00 | 18-Sep-25 18:00 | ALTALINK | TE | AltaLink Telecom Equipment, 256s 228X (256s Harmattan) | LAN switch replacement | 1.42 Days
Continuous |
|
17-Sep-25 08:00 | 17-Sep-25 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 928s RTU/SCADA (928s East Stavely), 349s RTU/SCADA (349s Stavely) | complete MPLS upgrade | 9 Hours
Daily |
|
17-Sep-25 08:00 | 17-Sep-25 17:00 | ALTALINK | TE | 635s RTU/SCADA (635s Rose Valley), AltaLink Telecom Equipment, 310p Protection & Control (310p Sundance) | upgrade MPLS node | 9 Hours
Daily |
|
17-Sep-25 08:00 | 17-Sep-25 17:00 | ALTALINK | TE | AltaLink Telecom Equipment | upgrade 330p MPLS node | 9 Hours
Daily |
|
17-Sep-25 08:00 | 17-Sep-25 17:00 | ALTALINK | TE | 391s Protection & Control (391s Balzac) | protection maintenance | 9 Hours
Daily |
|
17-Sep-25 08:30 | 17-Sep-25 14:00 | ALTALINK | Outage | 17s 757N (17s Benalto) | cutover 2052 breaker and maintenance switch status to new ‘B’ AIS relay . commission 757L lto | 5.5 Hours
Daily |
|
17-Sep-25 09:00 | 17-Sep-25 17:30 | ALTALINK | Outage | 62s 31 (62s Brazeau Plant), 62s T3 (62s Brazeau Plant) | 240kV breaker maintenance (n.o.) | 8.5 Hours
Daily |
|
17-Sep-25 09:00 | 17-Sep-25 12:00 | ENMAX | TE | 26.81L (SS-26 - SS-32) | 26.81L A and B Line Protection Outage. Transfer from JMUX to JPAX circuits. Fault clearing time 26.5 cycles. | 3 Hours
Continuous |
|
17-Sep-25 13:00 | 17-Sep-25 16:00 | ENMAX | TE | 24.82L (SS-24 - SS-65) | 24.82L A and B Line Protection Outage. Transfer from JMUX to JPAX circuits. Fault clearing time 26.5 cycles. | 3 Hours
Continuous |
|
18-Sep-25 07:00 | 18-Sep-25 16:00 | ENMAX | TE | Protection & Control (SS-14) | 14.1TR A and B and 14.1TR transformer protection replacement | 9 Hours
Continuous |
|
18-Sep-25 07:00 | 18-Sep-25 17:00 | ENMAX | RB | 14.83L (SS-14 - SS-36) | fall transmission line washing | 10 Hours
Continuous |
|
18-Sep-25 07:00 | 18-Sep-25 17:00 | ENMAX | RB | 39.82L (SS-39 - SS-162) | fall transmission line washing | 10 Hours
Continuous |
|
18-Sep-25 07:00 | 18-Sep-25 17:00 | ENMAX | RB | 38.83L (SS-38 - SS-39) | fall transmission line washing | 10 Hours
Continuous |
|
18-Sep-25 07:00 | 18-Sep-25 19:00 | ATCO | RB | 9L16 (755s Cordel - 972s Tinchebray) | install a new caisson foundation for Str 1 of the new CETO line being constructed | 12 Hours
Continuous |
|
18-Sep-25 08:00 | 18-Sep-25 16:00 | ATCO | TE | 769s RTU/SCADA (769s Stettler), ATCO Telecom Equipment | MDR8000 radio link major PM between Lonepine T and Stettler | 8 Hours
Continuous |
|
18-Sep-25 08:00 | 22-Sep-25 16:00 | CNRL | Outage | 842s 75-1904 (842s Horizon Upgrading) | breaker tank heater repair | 4.33 Days
Continuous |
|
18-Sep-25 08:00 | 05-Oct-25 20:00 | SUNCOR | Outage | 29EDD-61 29PT-653 (29EDD-61 Stony Island), 29EDD-61 30-252-500001 (29EDD-61 Stony Island) | 29PT-653 - Repair / Replace Burned Bonding Conductor (9000808061) | 17.5 Days
Continuous |
|
18-Sep-25 08:00 | 18-Sep-25 17:00 | ALTALINK | TE | 349s RTU/SCADA (349s Stavely) | Preform maintenance on 9269R | 9 Hours
Daily |
|
18-Sep-25 08:00 | 18-Sep-25 17:00 | ALTALINK | TE | 245s Protection & Control (245s Seebe) | on site settings changes | 9 Hours
Daily |
|
18-Sep-25 08:00 | 18-Sep-25 17:00 | ALTALINK | TE | 291s Protection & Control (291s Cochrane) | on site settings changes | 9 Hours
Daily |
|
18-Sep-25 08:00 | 18-Sep-25 12:00 | ENMAX | Outage | 11.82L (SS-11 - SS-14), 14B138-11.82 (SS-14), 14.1TR (SS-14), 14.3TR (SS-14) | Sub 14 Capacitor Bank Switcher Replacement. Bus outage required for initial energization on new 14B138-14.CAP. GOI on 14CAP (25N1050) to be released prior to outage. | 4 Hours
Continuous |
|
18-Sep-25 09:00 | 18-Sep-25 17:30 | ALTALINK | Outage | 62s T5 (62s Brazeau Plant), 62s 207 (62s Brazeau Plant) | Install Bushing monitoring devices | 8.5 Hours
Daily |
|
18-Sep-25 09:00 | 19-Sep-25 16:00 | ATCO | TE | 848s Protection & Control (848s Ruth Lake) | investigate soft control/ DNP mapping and test with SOC/ HMI to confirm the expected bits are being sent to/ from the relay | 31 Hours
Continuous |
|
18-Sep-25 09:00 | 18-Sep-25 12:00 | ENMAX | TE | 41.84L (SS-41 - SS-54) | 41.84L A and B Line Protection Outage. Transfer from JMUX to JPAX circuits. Fault clearing time 26.5 cycles. | 3 Hours
Continuous |
|
18-Sep-25 09:00 | 18-Sep-25 17:00 | ALTALINK | TE | 325s Protection & Control (325s Leduc) | standard relay maintenance | 8 Hours
Daily |
|
18-Sep-25 09:00 | 23-Sep-25 20:00 | SUNCOR | TE | 29PL6-3 (29EDD-1 Millennium - 30EDD-1), 30EDD-1 627 (30EDD-1) | 30EDD-1 29PL6-3 PRC5 Trip Path checks - 9000986658 29PL6-3 A87L GE L90 Firmware 8.6 - 300477554 |
5.46 Days
Continuous |
|
18-Sep-25 09:30 | 18-Sep-25 17:00 | ALTALINK | TE | 62s RTU/SCADA (62s Brazeau Plant) | RTU database update, ~15min supervisory outage required. Qualified switchman on site for the duration | 7.5 Hours
Daily |
|
18-Sep-25 12:00 | 18-Sep-25 16:00 | ENMAX | Outage | 14.2TR (SS-14) | trip testing and tranformer protection replacement | 4 Hours
Continuous |
|
18-Sep-25 12:00 | 18-Sep-25 16:00 | ENMAX | Trans Test | 14.1C (SS-14), 14.2C (SS-14) | testing cap bank switcher | 4 Hours
Continuous |
|
18-Sep-25 13:00 | 18-Sep-25 16:00 | ENMAX | TE | 35.81L (42s Sarcee - SS-35) | 35.81L A and B Line Protection Outage. Transfer from JMUX to JPAX circuits. Fault clearing time 26.5 cycles. | 3 Hours
Continuous |
|
18-Sep-25 17:00 | 19-Sep-25 18:00 | ALTALINK | Outage | 421s T1 (421s Hays) | closing open point 'A' on 25kV bus 1 | 25 Hours
Daily |
|
19-Sep-25 07:00 | 28-Sep-25 17:00 | ALTALINK | Outage | 1201L (520s Bennett - BCH Cranbrook) | completing component replacement from 1201L21 – 1201L435 | 9.42 Days
Continuous |
AB-BC |
19-Sep-25 07:00 | 28-Sep-25 17:00 | ALTALINK | Outage | 786L (799s Coleman - BCH Natal), 799s 786W (799s Coleman) | aligned with 1201L outage | 9.42 Days
Continuous |
AB-BC |
19-Sep-25 07:00 | 28-Sep-25 17:00 | ALTALINK | Outage | 887L (48s Pocaterra - 978s BCH Britt Creek), 48s 887X (48s Pocaterra) | aligned with 1201L outage | 9.42 Days
Continuous |
AB-BC |
19-Sep-25 07:00 | 28-Sep-25 17:00 | BHE Canada | Outage | MATL (120s Picture Butte - Montana) | align with 1201L outage | 9.42 Days
Continuous |
AB-MATL |
19-Sep-25 07:00 | 28-Sep-25 17:00 | AESO | Outage | Path 1 (AIES Islanding) | align with 1201L outage | 9.42 Days
Continuous |
AB-BC |
19-Sep-25 07:00 | 20-Sep-25 17:00 | ENMAX, ALTALINK | RB | 1065L (74s Janet - 102s Langdon) | fall transmission line washing | 1.42 Days
Daily |
|
19-Sep-25 07:00 | 20-Sep-25 17:00 | ENMAX, ALTALINK | RB | 1064L (74s Janet - 102s Langdon) | fall transmission line washing | 1.42 Days
Daily |
|
19-Sep-25 07:00 | 25-Sep-25 17:00 | ALTALINK | Outage | 520s T1 (520s Bennett), 520s R7 (520s Bennett) | south 520sT1 and R7 maintenance | 6.42 Days
Continuous |
AB-BC |
19-Sep-25 08:00 | 19-Sep-25 18:00 | ENMAX | Outage | 11.81L (SS-11 - SS-13), 11.4TR (SS-11), 11.1TR (SS-11) | Substation - Insulator Washing (Fall). SW83 - west phase - hard to seat in jaw. Reversing Switch Check - 11.4-TC, 11.1-TC, Oil Sampling 11.1-TC | 10 Hours
Continuous |
|
19-Sep-25 08:00 | 19-Sep-25 13:00 | ALTALINK | Outage | 410s T1 (410s Josephburg) | urgent extend 410sT1 CT wiring to DDR PRC002 compliance | 5 Hours
Daily |
|
19-Sep-25 09:00 | 08-Oct-25 17:00 | ALTALINK | TE | 58s RTU/SCADA (58s Edson) | update configuration for cap bank protection replacements | 19.33 Days
Daily |
|
19-Sep-25 09:30 | 08-Oct-25 18:00 | ALTALINK | Outage | 58s C1 (58s Edson) | replace 58s C1 and associated protections | 19.35 Days
Continuous |
|
19-Sep-25 13:00 | 19-Sep-25 18:00 | ALTALINK | Outage | 410s T2 (410s Josephburg) | Extend 410sT1 CT wiring to DDR. Must be done to meet PRC002 compliance | 5 Hours
Daily |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |